6-monthly inspections and the full strip-down inspections at ten or five years. Also able to conduct NDT tests (Ultrasonic) of the pins and bearings.
10 yearly major inspections as well as NDT requirements
6 monthly High Voltage insulated boom inspections
12 monthly bucket liner high voltage inspections
2 yearly acoustic emission testing of FRP booms